youssef Michail

مهندس مدني

send message

Last seen: Since 1 Year 2 Month   registration date : Since 1 Year 2 Month

primary data
male
1992-03-18
eng.youssef.mamdouh92@gmail.com
+96567759798
Kuwait
Hawalli
وظائف مهندسين مدنى
9 year
Experience and qualifications
Experience

SITE ENGINEER | HEAVY ENGINEERING INDUSTRIES AND SHIPBUILDING COM (HEISCO) | JUL2022 - PRESENT

 Project: Execution, completing and maintenance of the access link road to MKP on Bubiyan Island.

 Owner: State of Kuwait Ministry of Public Works / Consultant: Dar SQC International Consultants.

 Responsibilities: Road works, embankment works, underground utilities work, and concrete work.

TECHNICAL OFFICE ENGINEER | PERFECT CONTRACTING COMPANY | AUG 2021 – JUN 2022

 Project: “Dahab Resort development and renovation.

 Owner: Misr Hotels Company / Consultant: ACE Consulting Engineers - Moharram Bakhoum.

 Responsibilities: Quantity surveying and Shop drawing.

SITE ENGINEER | HEAVY ENGINEERING INDUSTRIES AND SHIPBUILDING COM (HEISCO) | MAR 2017 – FEB 2021

 Project: Gas train 5 – Mina Al Ahmadi.

 Owner: Kuwait National petroleum Company (KNPC) / Consultant: AMEC Foster Wheeler.

 Responsibilities:

 Concrete works: execution of Storage tank foundations, pipe racks foundations, pipe sleeper foundations,

equipment foundations, compressor foundations, paving works, asphalt roads, shelter foundations, drain

vessel pits, storm water network, manholes, culverts and trenches.

SITE ENGINEER | HEAVY ENGINEERING INDUSTRIES AND SHIPBUILDING COM (HEISCO) | JAN 2016 – MAR 2017

 Project: New Gathering Centre GC-30 north Kuwait.

 Owner: Kuwait Oil Company (KOC) / Consultant: AMEC Foster Wheeler.

 Responsibilities:

 Concrete works: execution of Storage tank foundations, pipe racks foundations, pipe sleeper foundations,

equipment foundations, compressor foundations, paving works, asphalt roads, shelter foundations, drain

vessel pits, storm water network, manholes, culverts and trenches.

SITE ENGINEER | AL ANDLOS FOR CONSTRUCTION | JAN 2015 – NOV 2015

 Project: Porto Sharm.

 Consultant: Engineering Consultant Group (ECG).

 Responsibilities:

 Finishing Works: Execution of floor waterproofing and chemical waterproofing for pools, plastering and

painting, installation of ceramic tiles, marble, GRC, and roofing tiles.

 Landscaping Works: Execution of stamped concrete, interlocking pavers.

 Infrastructure Works: Execution of irrigation, sewage networks and fire protection networks