2- Working experience
2.1- RATP Dev. Mobility Cairo (December 2021 -Present)
•
Senior telecom engineer.
•
Telecom maintenance engineer.
Responsibilities:
•
In charge of performing all corrective and preventive maintenance of all Telecom assets:
•
Response for 11 systems (UPS- CCTV- Fire detection- Public address- Voice recording- Telephone- Intercom- Clock server- Multi serves network “MSN”- Radio system “Tetra” Repeater- Dynamic display (PIS)).
•
Working on MAXIMO IBM software.
•
Supervising Testing & Commissioning and installation of the new phases of Cairo metro line 3.
•
Witnessing telecommunication subsystems installation drawings and method statements with subcontractor.
•
Prepare reports for the FAT/SAT tests results.
•
Supervision of system integration tests.
•
Attend meetings and workshops with the contractor and the client.
•
Training the newcomers for telecom team.
•
Planning telecom activities of preventive maintenance.
•
Monitoring MTTR and MTBF of telecom systems.
•
Preparing incident reports for telecom and any system failures.
•
Design new improvement tasks for old systems.
•
In-charge of tools requesting, and specification of which tools are needed to get the job done.
•
Follow -up lifting of remarks of punch list.
•
Follow-up on the completion of monthly preventive maintenance tasks in due time.
•
Follow-up on the completion of monthly corrective maintenance tasks in due time.
•
Safe tracker user for preventive and corrective work permits approval.
2.2-ACTEL communications S.A.E (December 2017 to December 2021)
•
System Engineer at ACTEL.
•
RF senior Engineer at ACTEL.
•
Site Engineer at ACTEL.
Responsibilities:
•
Technical office work (Technical Reports-Shop Drawing-Mobile radio RF planning- Project Planning)
•
ODP: October dry port fiber passive network installation.
•
Adly Mansour transportation hub light current installation (PA-FA-CCTV-IP Telephony-Security Gates-Passive Network).
•
ENR modernization project working on RF planning for (Itay El Barood and October-Ekata and Giza-Bani Sufi) Lines.
•
ENR 38 radio base station installation from High Dame to Al Mansoura and RF coverage for half duplex system Tait.
•
ENR 300 Radio installation all RF installation in old trains half duplex Tait.
•
TOA: Public Address Project in Metro’s first Line working on installations.
•
Simoco: DMR (Digital Mobile Radio) in Metro’s first and second Line working on installations and troubleshooting.
•
Bosch: Fire alarm system for the first line stations worked on installation and integration.
•
Huawei and Siemens: Passive network pilot project for Egyptian railway working as senior site engineer.
•
Thales: radio swap from old buildings to the new buildings for Egyptian railway upper Egypt/RF survey to locate dead spots on the track.
•
GE: programing/maintaining the radio system on the 100 new locomotives brought to Egyptian railway.